In April, 1928, a severe storm and high tide partially breached the barrier near the present location of the inlet, and intense
rainfall and construction of a pilot channel by local inhabitants in 1929 rapidly widened and strengthened  the present location
of East Pass inlet.  
















































































This is a 1938 mosaic that shows the inlet in its pre-stabilized condition. (US ARMY CORPS OF ENGINEERS)
Counter
HISTORY OF THE
DESTIN JETTIES
1935
1935
1955
1968
1967
1945
1944
1944
1969
1969
1972
1973